XLD3-1.5KW-17 cycloidal pinwheel reducer maintenance method
The maintenance method for XLD3-1.5KW-17 cycloidal pinwheel reducer is as follows:Regular inspection: Regularly check the operating status of the gearbox, including temperature, vibration, noise, etc. If there is any abnormality, the machine should be stopped immediately for inspection to prevent the fault from expanding.
Lubrication and maintenance: Regularly add or replace lubricating oil according to the requirements of the product manual. Pay attention to selecting the appropriate type of lubricating oil to ensure the lubrication effect.

Cleaning: Regularly clean the reducer, including the housing, gearbox, and other parts, to prevent dust and debris from accumulating and affecting heat dissipation and normal operation.
Sealing inspection: Regularly check the sealing performance. If there is any damage, replace the sealing components in a timely manner to prevent lubricating oil leakage and external debris from entering.
Tightening inspection: Regularly inspect and tighten all fasteners to ensure their tightness and prevent any looseness that may affect the normal operation of the gearbox.
Regular replacement of parts: For some vulnerable parts such as bearings, gears, etc., they should be replaced regularly according to the requirements of the product manual to prevent malfunctions caused by part wear.
Environmental requirements: Place the gearbox in a dry and ventilated environment, avoiding direct sunlight and high temperatures to reduce the aging of lubricating oil and wear of the gearbox.
Personnel training: Regularly provide professional training for operation and maintenance personnel to improve their operational skills and troubleshooting abilities.
In addition, there are some other key points:
After the first refueling and continuous operation for 100 hours, it is necessary to replace the oil with a new one. Before changing the oil, any remaining oil stains inside should be washed clean. The second oil change can be done after six months of use. If the daily working hours exceed 8 hours or the operating environment is poor, it is necessary to flexibly control the oil change time and change it every 3-5 months.
Regularly replenish lubricating oil to ensure continuous operation of the machinery. When injecting specialized grease, it is necessary to ensure sufficient injection volume and quality, and the working environment should be kept clean and tidy to prevent dust from entering the lubricating oil.
Regularly test and inspect the concentricity of the coupling, perform regular checks on the fixing bolts, and tighten any loose bolts in a timely manner. If there is swinging or uneven movement force during the operation of the reducer, check whether the anchor bolts are loose and reinforce them in a timely manner.
If the temperature of the gearbox rises too quickly during normal operation, exceeding 70 ℃, or if the temperature is normal but there is abnormal noise, the gearbox should be opened to check whether the bearings, pins, bushings, and cycloidal discs are worn or damaged, and replaced and repaired in a timely manner