Installation steps of WD250-53-V worm gear reducer
The installation of WD250-53-V (center distance of 250 mm, i ≈ 53, single-stage, V-shaped installation) follows the standard process of "preparation → foundation and positioning → alignment → lubrication and ventilation → running in and loading", with a focus on rigid foundation, double plane precision alignment, correct oil injection, and temperature rise monitoring. Standard installation steps: