Installation and commissioning standards for rotary kiln reducers
Step 1: Basic inspection before installation. Before installation, confirm that the reducer model, parameters, and equipment match, and check that the equipment housing, gears, bearings, and seals are not damaged or defective; Clean the installation base to ensure that it is flat, sturdy, and free of debris, and to avoid force displacement after equipment installation. Step 2: Precise alignment